Together with the assistance of TNT Crane and Rigging We skated a 150-ton air cooled Quantech chiller and extended all of the piping to accommodate more parking space for the renovation work they are performing on the Genard Building. We also reinisulated the piping to put the finishing touches on an already superbly executed project.
Foxconn Opticool
Installed for Opticool Technologies a 100 ton chiller and all Piping serving a Pumped refrigerant system that served 18 rolling oracle server racks at the Foxconn manufacturing facility.